Video coming soon
All case studies

251 Newington Causeway Residence, London

A 47-storey residential tower at Elephant and Castle required THERMIO screed pumped over 20 floors, with XTR specified elsewhere. 35,000 m² of screed was delivered on a 50 mm floating floor over insulation. The thinner screed depth improved insulation depth and UFH performance with guaranteed thermal output.

Location
Elephant and Castle, London
Date
March 2018
Product
THERMIO and XTR
Installer
TCS Screeding
Application
Private residential development — 47-floor high-rise

The challenge

To pump Thermio over 20 floors. TCS took the challenge on and proved successful.

The solution

Gyvlon Thermio+ liquid screed was chosen as the screed depth is thinner than the original specification, giving better insulation depth and a better performance for the UFH with Thermio's guaranteed Thermal Performance.

Results

The tripods were set at 2 m spacing, ensuring an SR2 finish was achieved with minimum effort. TCS managed to keep the cost down as there was no need for an additional pump and it was installed faster.