School Teaching Block, Evesham

Prince Henry's High School in Evesham needed a new teaching block back in use quickly, with floor finishes required just 4–6 weeks after screed install. ECO FD E2C was supplied by Flowmix to Central Flow Screed across 1,600 m² overall. Floor coverings were applied after just four weeks.

Location
Evesham
Date
November 2020
Product
ECO FD E2C
Installer
Central Flow Screed
Application
School teaching block

The challenge

High school in Evesham on a tight programme for reopening a new teaching block, requiring floor finishes to be applied 4–6 weeks after screed install.

The solution

Gyvlon FD (faster drying) liquid screed supplied via Flowmix to Central Flow Screed.

Results

750 m² supplied in this visit with floor finishes being applied after 4 weeks to the floors.