Conversion of a former Frankie & Benny's restaurant into two fast-food outlets required a thin, fast levelling screed after new services were installed. Our EXCELIO screed was bonded from 15–30 mm across 450 m². The floor was poured in a single morning and ready for following trades within 24–48 hours.

Location
Scunthorpe
Date
March 2021
Product
EXCELIO
Installer
Liquid Screed Pumping
Application
Commercial / restaurant refurbishment

The challenge

Old Frankie and Benny's restaurant refurbishment into two fast food outlets.

Screed required to level the old unit after new services were installed; originally planned for 30mm unbonded but issues with levels meant a thinner screed was required.

The solution

Gyvlon Excelio due to it being able to be bonded from only 12mm — a fast, cost-effective solution for large areas.

Results

450 m² poured using two ready-mix truck deliveries on the same day, leaving the floors finished to SR1, ready for the following trade 24/48 hrs afterward.

Ready-mix Excelio screed poured from 15 to 30 mm thick, levelling the industrial unit to the required datum — no cracks or curling, ready for the following trades.

By using ready-mix Gyvlon Excelio flowing screed the contractor saved time, money, waste and the environment compared to bagged products.